Name of Project: Souapiti Hydropower plant project
Year: June 2018
Location: Guinea (Conakry)
Client: Administration et Contrôle des Grands Projet et Marchés Publics (ACGPMP)
Main Project Features: Souapiti: 4 units, installed capacity of 4 x 112 MW,
Positions held: Power system engineer
Activities performed: Integration studies of the hydroelectric power plant of Souapiti in the interconnected electrical network of Guinea through a load flow, short circuit currents, contingency analysis and transient stability analysis
Checking of the need of generators to operate as synchronous condensers.
Software used: Power Factory